Replace the whole set
If one rope needs replacing, the whole set is replaced: new ropes, all from one manufacturer, of the same material, grade, construction, and diameter.
The A17.1 rules a rope job runs into, one card each, filed by topic.
A word, a figure, or a section number, in any edition.
Open the Code Reference on one of your elevators and each card gets a line with that elevator's own figure — pass or fail wherever the code sets a limit, and a tap opens the page that holds the fact.
Open on an elevatorWhich ropes, how many, how strong, how they are tensioned, and when one is done.
If one rope needs replacing, the whole set is replaced: new ropes, all from one manufacturer, of the same material, grade, construction, and diameter.
A traction machine carries at least three suspension ropes (a drum machine two). A steel rope from 8 mm up to 9.5 mm (3/8 in) needs a factor of safety of 12 or broken-member detection; under 8 mm, broken-member and residual-strength detection; 4.0 mm is the floor.
Breaking force times the number of ropes, divided by the load they carry, must meet Table 2.20.3 for the rope speed: 7.60 at 50 fpm rising to 11.90 at 1,400 fpm and above for passenger cars (6.65 to 10.55 freight).
Replace on crown breaks per lay — 24 for six-strand, 32 for eight-strand rope, halved where there is rouge or unequal tension — on more than one valley break per lay, on any valley break with rouge, or on a diameter down 6.25 % (3.125 % with rouge).
Ropes in a set are equally tensioned when the lowest tension measured is within 10 % of the highest.
Hoist ropes are lubricated as the rope data tag says, lightly, and with precautions against loss of traction.
Sockets, shackles, retaining clips, and the rope data tag.
The live rope leaves the socket in line with the shackle rod. Two non-load retaining clips tie the tail to it: the first within 4 rope diameters of the socket, the second within 8 of the first, and the wedge stays visible under load.
Hoist ropes end in tapered babbitted sockets or wedge sockets, each developing at least 80 % of the rope's breaking strength with the rope breaking before the socket; shackle rods as strong as the rope allow each rope its own adjustment; U-bolt clamps are never the fastening.
Mark with 2–3 ft of slack, seat the wedge with a quick pull on the tail, leave thread for the washer, two nuts and cotter pin, then release the car: rope and wedge rise about 1 in to their set, and every wedge stays visible.
A new tag (or permanent marking) at the fastenings at each replacement, in letters at least 1.5 mm (1/16 in) high: the type, diameter, minimum breaking force, residual strength where required, grade, construction, whether nonpreformed, the finish, whether compacted, the maker, the installer, the month and year installed and first shortened, and the lubrication.
Sheave size, rope retainers and guards, and the traction test.
Drive, deflector, and secondary sheaves have a pitch diameter of at least 40 times the rope diameter.
In seismic zone 2 and above — all of California — every sheave the ropes run over has rope retainers "to inhibit the displacement of ropes", continuous over at least two-thirds of the arc of contact with no more than one-sixth exposed at each end, and every required sheave guard is in place.
With the car or the counterweight resting on its buffer, the ropes must slip on the drive sheave rather than lift it; the traction-loss detection is tested the same way.
Top-of-car and pit clearances, runby, buffers, and compensation.
Spring buffers only up to 200 fpm (1.5 in stroke to 100 fpm, 2.5 in to 150, 4 in to 200); above that, oil buffers with a stroke based on 115 % of rated speed at 1 g.
With the car level at the top landing, the crosshead clears the overhead by the counterweight runby plus its buffer stroke plus 24 in, plus half the gravity stopping distance at 115 % speed where an oil buffer has no anti-jump means; anything on the car top keeps at least 6 in.
With the car on its fully compressed buffer there is 24 in between the pit floor and the lowest part of the car; bottom runby is at least 6 in with oil buffers, and no more than 24 in for the car or 900 mm (35 in) for the counterweight (§2.4.4).
Once the new ropes are on, or old ones are shortened, the car and counterweight runby and the top-of-car clearances are brought back to what the code required when the elevator was installed.
Above 700 fpm the job needs compensating ropes with a tie-down sheave; jacketed compensating cable is only published to 700 fpm.
The governor rope, and the governor after a rope change.
Iron or steel, regular lay, at least 6 mm (1/4 in) with a factor of safety of 8 below 9.5 mm, never tiller-rope construction, and never lubricated after installation: a governor rope that has had lubricant on it is replaced and the governor and safety retested.
A new governor rope gets a pull-through test and a dated tag, and the governor seals and jaws are examined.
When a rope change is an alteration, who has to hear of it, and the record.
Replacement ropes are what the original manufacturer specified, or at least equivalent in strength, weight, and design; a change in material, grade, number, or size is an alteration under 8.7.2.21.1.
The on-site maintenance record notes the rope replacement, and the rope data tag, the tension check, and any governor rope test tag go with it.
Section numbers follow ASME A17.1-2019 / CSA B44-19 and are noted where a rule moved between editions. Figures were checked against the published code and the state transcriptions of it, but the edition the AHJ has adopted is the one that counts — read the rule there before relying on a card.